Free Download Achi Ir Pro Sc Manual Programs
Free Download Achi Ir Pro Sc Manual Programs That Help. 5/22/2017 0 Comments. Corel videostudio pro x2 v12.0.98.0 crack free download. Canon ir 2525 driver download; Jprobe. OH 45433 to help us maintain a. Lift Typical Variation of Section Maximum Lift with Free-Stream Mach.
• 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd IR6000 BGA Rework Station User Manual WWW.LYBGA.COM. • 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd IR6000 IR6000 BGA rework stations feature 一、 BGA Rework Station is designed to meet the ever-changing demands IR6000 of today’s fast BGA Rework manufacturing environments , Have the following characteristics: Rework station for laptop motherboards, desktop computer motherboards, 1、.
• 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd Safety Instructions Ⅰ.Electrical safety Make sure the supply power voltage accord with the standards---- 220V-250V/50hz alternating current before installing. To avoid possible electric shock caused serious damage, please disconnect the power cord from the outlet temporary before moving machines.
If the machine damages, please contact us for maintenance. • 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd Operation temperature:15 ~ 45 ℃ Operation humidity:5% to 95%, non-condensing Products should be kept in the air mobility of a smaller environment under the welding operation. 2.Conservation environment of products Storage temperature:-20 ~ 70 ℃ Storage humidity: 5% to 95%, non-condensing WWW.LYBGA.COM. • 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd BGA Rework Station The parameters of BGA Rework Station IR6000 Basic Parameters Heating Dimension L 475mm×W480mm×H420 mm Weight 16kg Total weight About 17 kg, vary with the differen need of the users Electrical Parameters. • Hardware description BGA Rework Station is composed of upper part of Heating Components / IR6000 Bottom Preheat Module / Bracket / Temperature Control Parts! Temperature control Table is control the upper and lower heating, Can Simultaneously heated or first preheat, then the upper part of heating.
• 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd 8. Lighting Switch 9. Upper fan Switch 10. Start Switch 11. Stop Switch 12. Upper Programmable Temperature Control pc410 13.
Guitar rig 4 presets torrents site youtube. Bottom Temperature Control CH6 Self-help Install PCB Table Installation side support. Installation Slip. Installation side support. • 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd Upper Heater WWW.LYBGA.COM.
• 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd Cable connector Temperature sensor WWW.LYBGA.COM. • 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd Installation of RS232 communication interface Both suitable for Desktop & Laptop Interface for desktop transfer cable for laptop Programmer/Controller General Description 程序控制器内部已设置多个常用程序段,不要轻易尝试修改程序参数。请按 PTN 键 选择您所需要的程序段, The programmable controller contains an in-built setpoint generator in addition to the controller function. • 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd The sixteen segments are defined in the order: Ramp 1, Dwell period 1, Ramp 2, Dwell period 2., and are executed in succession.
Item Functions ① Parameters setting key (Up key) Increase value (Down key) Decrease value ②. • 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd ⑩ TIME (SV/MV/TIME display) It indicates the Setting Value(SV), Manipulating Value(MV), or Time(TIME) (The display content can be changed by the ‘DISP/SELECT’ key) ⑪ It is lit when the Alarm1 output is ‘ON’ (Communication indicator) It flashes when the controller is in active communication with a host computer. • 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd Program Parameter List WWW.LYBGA.COM. • 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd Rework Operation Steps 1、be all set ① Fixed motherboard ② shift sensor ,sensor press close to BGA chip。 ③Adjust the height of heating head with adjustment knob(Prompt:BGA chip in the middle of heating head ,heating head away from BGA chip≥2CM。) WWW.LYBGA.COM. • 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co., Ltd 2、Start heating 1、Open power switch. 2、Select the appropriate temperature program segment, and then press the start switch. In the operation can press the stop switch, stop operating.